Eskom is tripping, loadshedding Stage 4 recommences today

The downgrade to Stage 2 was pretty short-lived. Thanks to the sudden tripping of three Kendal Power Station units, South Africa will be forced back to Stage 4 from 10 am today until 5 am Thursday. Eskom announced in a tweet that the loss of these units has cost the power utility 1920 MW of maximum generating capacity. A full … Continue reading Eskom is tripping, loadshedding Stage 4 recommences today