Seems like the next coming months will be very hard for Eskom as they have reached Code Red warning.
Also read: Why Eskom’s load-shedding still far from recovery
This past weekend, the struggling entity published its outlook for 2023 and it predicted unpleasant results for two weeks at Christmas, and during one week in September 2023. Declaring that it is operating at Code Red. As per report by the South African.
If you are wondering what Code Red means, “It’s a combination of the same old things. The old (power) plants are getting older and are breaking down regularly as described by BusinessTech.
However, the news come from a R5 billion nuclear generator destined for the Koeberg Nuclear Plant that was ‘dropped on the factory floor’, causing extensive damage to the 360-tonne structure.
This has resulted in serious results causing more fractions and consequences.
Also read:
Picture: Cape Town Etc {Gallery}