Eskom announced that loadshedding has been downgraded to stage 4 from 9am this morning, Sunday, 26 February 2023, until further notice is published.
Also read: Update: André de Ruyter out, Calib Cassim in as Eskom’s interim CEO
The power utility is currently carrying out necessary maintenance at certain power stations on an urgent basis.
Also read:
Premier Winde shares his R1bn plan to save the WC from loadshedding
Picture: Murray Swart