Residents hoping for an end to load shedding will be disappointed to know that it will continue today and has been shifted to Stage 4.

Eskom says rational load shedding will continue in an effort to build up necessary water reserves in the pump storage scheme, while being the result of an ongoing “shortage of capacity” that put pressure on the power grid after import from Mozambique did not arrive as expected.

Locals will experience Stage 4 load shedding between 8am and 11pm today.

Schedules for load shedding that will take place throughout the day in Cape Town can be found here.

Locals are advised to treat all electrical points as live during load shedding. Stage 4 requires 4000MW to be shed.

Eskom customer centre on 0860 037 566

Picture: Pexels

 

 

Article written by

We love this place! Cape Town Etc features news, reviews, entertainment and lifestyle in the Mother City.